World's First Infrastructure Intelligence Platform

Carbon-Negative Concrete. Corruption-Proof Infrastructure.

Zero clinker. 100% Philippine volcanic resources. Every batch sensor-verified, satellite-monitored, AI-analyzed, and hashgraph-verified. The concrete is our first product. The platform governs all infrastructure.

The Problem is Physical

A ledger registering contracts and payments is a transparent ledger of lies. Verification must happen at the physics layer.

₱42–119B

Lost annually to infrastructure corruption

Ghost projects and substandard construction

114

Dead from Typhoon Kalmaegi

Despite ₱26B in flood control funding to Cebu

$3–4B

Annual clinker imports

Despite world-class volcanic ash deposits

30–35M

Tons of cement needed annually

Build Better More program demand, growing 5–7%/year

Our Solution

Intelligent Cement System

Four pillars that make Bulkrete fundamentally different — an infrastructure intelligence company whose first product is the world's best concrete, and whose platform serves the entire construction industry.

Carbon-Negative Materials

0% clinker. 100% Philippine-sourced. Every ton sequesters CO₂ instead of emitting it.

AI-Verified Quality

Proprietary Domain Coupled Learning (DCL) — MIMO mathematics applied to physical systems — predicts and verifies performance from formulation through decades of service. Compact, deterministic, edge-deployable. No cloud required.

Corruption-Proof Integrity

5 layers of independent verification make ghost projects and substandard construction impossible.

Project Agent Orchestration

Dedicated ICS Project Agent on Hedera Guardian orchestrates the full project lifecycle — from procurement through decades of monitoring. Material-agnostic by design: the platform serves any infrastructure project, not just Bulkreto.

The Platform Play

Two Businesses. One Platform.

Amazon built world-class computing infrastructure to sell books. Then realized the infrastructure was more valuable than the bookstore. Bulkrete is building world-class infrastructure intelligence to pour carbon-negative concrete. The ICS Project Agent — orchestration, verification, governance, and stakeholder reporting — applies to any large-scale infrastructure project regardless of material.

Tier 1: Full ICS
Bulkreto Materials

Complete Intelligent Cement System: DCL-optimized formulations, embedded sensing, carbon sequestration monitoring, self-healing verification, and Project Agent orchestration. Carbon credits generated continuously through automated dMRV.

Tier 2: ICS Project Agent
Any Infrastructure Project

The orchestration and verification platform deployed on any infrastructure project — including conventional Portland cement. Same coordination intelligence. Same on-ledger governance. Material-agnostic. When DFIs require transparent project oversight, Tier 2 clients are already compliant.

The concrete feeds the platform. The platform scales the company.

Verification Architecture

Five Layers. Zero Fraud.

Ghost projects become impossible. Substandard construction is immediately visible. The corruption business model breaks.

1

Nano Sensors

Embedded carbon nanotube strain networks, pH sensors, and chloride electrodes continuously measure actual performance from inside the material.

2

Satellite Surveillance

Synthetic aperture radar detects millimeter-scale deformation. Optical imaging confirms physical existence and condition.

3

Domain Coupled Learning

Proprietary AI architecture occupying the space between single-domain ML and broad-spectrum LLMs. Learns the coupling structure of the entire physical system. Correlates all data sources, detects anomalies, and flags divergence between predicted and actual performance. Compact enough to run on edge hardware at the pour site.

4

Hedera Guardian Ledger

Every measurement timestamped, immutable, and publicly verifiable on distributed ledger technology.

5

PwC Attestation

Big Four professional liability backs the data integrity with independent third-party verification.

Impact at Scale

At full capacity — 100,000 tons per year from a single BARMM facility.

100,000

Tons/year production capacity

Full-scale facility target

10,000–30,000

Tons CO₂ sequestered annually

Net carbon-negative at scale

0%

Clinker content

100% Philippine-sourced materials

6

Product lines

Engineered for Philippine conditions

Built for Every Stakeholder

Whether you're funding infrastructure, building it, or governing it — Bulkrete changes the equation.

Government Officials

End infrastructure corruption with physics-based verification. The ICS Project Agent becomes institutional memory — when a minister asks for project status, the answer is a real-time query to an on-ledger entity with sensor-verified data, not a consultant's PowerPoint. Aligns with Tatak Pinoy, Build Better More, and Paris Agreement.

Investors & DFIs

Two revenue engines: carbon-negative materials at product margins, and infrastructure intelligence at software margins. Carbon credit upside. Import substitution. A phased capital strategy that earns the right to scale. The platform business scales beyond concrete into every DFI-financed infrastructure project globally.

Engineers & Contractors

6 Bulkreto product lines engineered for Philippine typhoons, earthquakes, and saltwater. Zero clinker. Familiar workability. Plus: the ICS platform handles project coordination, verification, and reporting — so you can focus on building.

Location

Why BARMM

The Bangsamoro Autonomous Region in Muslim Mindanao is not a default location. It is a strategic choice at the intersection of three development mandates.

Climate

BARMM faces severe coastal erosion, typhoon exposure, and seismic risk. Every seawall, harbor, school, and road built during the Bangsamoro Transition locks in either decades of carbon-intensive Portland concrete — or a new trajectory.

Peace Dividend

The Bangsamoro Transition Authority is building institutional architecture for a new autonomous region. Bulkrete creates high-value technical employment — not commodity labor — in a region where economic opportunity is the foundation of lasting peace.

Sovereignty

BARMM's autonomous authority enables entity formation, regulatory innovation, and development finance compatibility. The region's rice belt provides biochar feedstock. Its volcanic geology provides pozzolanic ash. Its coastline provides seawater for curing. Every input is local. Zero import dependency.

For ADB, World Bank, and the Islamic Development Bank, BARMM is where climate, poverty reduction, and peace-building mandates converge in a single investment.

Earned Right Approach

Phased Capital Strategy

Each phase earns the right to the next. If feasibility fails at $500K, total exposure is minimal and research outputs have public-good value.

Phase I
Feasibility

Foundation

3–6 months

  • CaO formulations reach 20+ MPa
  • TAAL MgO CO₂ uptake proven
  • Carbon-negative status confirmed
  • DCL v1 calibrated within ±15%
Phase II
Pilot Plant

Validation

6–12 months

  • 5 tph pilot plant operational
  • Batch-to-batch consistency achieved
  • Regulatory certification obtained
  • Government pilot project delivered
Phase III
Full Scale

Production

Years 2–4

  • 100–120K tons/year facility
  • All 6 product lines in production
  • National distribution network
  • Carbon credits flowing via Verra/Gold Standard

Leadership & Advisory

Patents, industry relationships, and institutional credibility.

Arnold Alagar

Founder & CTO

24 issued US patents (MIMO)Former NASA / USAF / SDSC

Dr. Eugen Tjong

Interim CEO (Years 1–3)

MD + PhD Civil EngineeringFormer Thomson Reuters

Alex Cabrera

Advisor — Governance & Audit

Former PwC Philippines ChairmanIsland Group

Ernesto "Ernie" Ordoñez

Advisor — Cement Industry

Former CeMAP PresidentFormer DTI Undersecretary
Technology Architecture

Built on Enterprise Infrastructure

Hedera

Hashgraph distributed ledger and Guardian policy engine for project governance and immutable verification.

Google Cloud

Computational infrastructure for DCL processing, sensor data ingestion, and Project Agent orchestration.

Anthropic

AI-powered stakeholder communication — translating DCL outputs into human-readable reports for project managers, financiers, and regulators.

PwC

Independent Big Four attestation of data integrity and verification architecture.

Bulkrete

Build the Future With Us

The Philippines sits on world-class volcanic resources. Bulkrete turns them into carbon-negative infrastructure that verifies its own integrity.